Astrapool Dual Pure 60 Manual - Página 15
Navegue en línea o descargue pdf Manual para Equipos de iluminación Astrapool Dual Pure 60. Astrapool Dual Pure 60 20 páginas. Salt electrolysis and ph regulation
Checking the state of the electrode:
The voltage can be measured at both terminals of the electrode; it must be approximately 9 volts.
Measure it in the DC position, with a salt content of 4g/litre, a water temperature of more than 15°C
and an electrode without calcareous encrustation.
If the voltage is more than 10.5 Volts
quickly.
Reminder: each kind of electrode receives a specific current indicated on the left-hand sticker.
A current of more than one amperes less that indicated signifies a problem either with the salt , the
electrode itself, the water temperature or limescale encrustation.
Cleaning the pool drainage filter:
Stop the chlorinator during any handling of the filter's six-way valve : cleaning, rinsing, draining, etc.
INDICATORS
Flow switch fault:
When this indicator is lit all production is halted: this means that the flow switch is badly positioned,
faulty or else the flow through the chamber is non-existent or insufficient.
Production fault:
When the electrode produces less than 75% of its capacity, the indicator lights up without stopping
the operation of the chlorinator:
-
The salt content is insufficient
-
The water temperature required the device to stop
-
The electrode is encrusted with limescale (see paragraph on limescale encrusted electrode)
-
The electrode is weakening and should be replaced soon
(see paragraph about limescale encrusted electrode)
Stand-by:
The device has finished its production cycle according to the percentage that you have indicated
using
or
; it is waiting for the end of the cycle (100%) so that it can re-start on the other
polarity.
, then the electrode is worn out and should be replaced
Example: for a salt chlorinator 60 : 8.5 ampères.
15
Número de revisión
ENGLISH
Rev 001-2013-08-06