Akw AKW91275L Manual de instalación y uso - Página 7
Navegue en línea o descargue pdf Manual de instalación y uso para Productos de fontanería Akw AKW91275L. Akw AKW91275L 12 páginas. Shower screens
10. Securing the Door and Panel to the Compensators
Fully tighten the screws on the adjustment mechanism on the inside of the compensators.
Drill a 3.5 mm pilot hole through the hole on the outside of the compensator. Insert a 4.2 x 13
mm pan head screw (no.8 x ½") through a folding screw cap and screw into the pilot hole.
11. Fit all remaining Caps
Fit all panel stile caps and compensator caps.
Fig. 12
Order: 01905 823 299
|
orders.akw-ltd.co.uk
Fig. 10.0
no.8 x ½ pan
with uniscrew cap.
Viewed from outside of the tray
Fig. 11.0
Fig. 13
Installation
Compensator
Compensator
Door
Technical Support: 01905 560 219
7