Dovre 640 GM Instrucciones de instalación y manual de funcionamiento - Página 6
Navegue en línea o descargue pdf Instrucciones de instalación y manual de funcionamiento para Estufa Dovre 640 GM. Dovre 640 GM 18 páginas. Dovre multifuel stove installation instructions and operating manual
3.2.
Preparing the stove
Please inspect the stove for damage caused during transport immediately after deliv-
ery and notify your distributor in case there are any defects. Do not put the stove
into operation in the meantime.
In order to avoid damaging the stove during installation and to make handling of the
stove easier, it is recommended to remove previously all loose parts (fire-resistant
bricks, ashtray, ...) from the stove. Note the location of those parts while removing
them, so that you have no difficulties in re-assembling the parts later on.
The stove will be supplied with the following parts:
•
A connection collar with fixings
•
A blanking plate with fixings
•
A "cold handle" for the door
•
A "cold handle" to pull out the ashtray and shaking the grate
•
A "cold handle" to open the filling lid
•
A scraper for the ashes
3.2.1. Smoke outlet
Your stove is suitable for two
connections: a top or a rear
connection.
Upon supply, the top and rear
exhausts have been left open.
Depending on the position cho-
sen, one opening can be cov -
ered with the blanking plate
supplied (2); the other one can
be equipped with the connec -
tion collar supplied (1) (see pic -
ture). Use the fixings supplied
and be sure to tightly seal the
connection collar and the blank-
ing plate to the stove by means
of the kit or paste supplied.
In order to make the connection
easier, the top plate (3) may
simply be removed from the
stove and replaced afte rwards.
The blanking plate (2) is de-
signed such that, in case of rear
mounting, it seems to be an
integral part of the top plate; in
case of top mounting, it can
cover the rear opening without disturbing the outer appearance.
640GM - 760GM
2
6
3
1
03.27602.000