Dowco V322 CC - 2019 Instrucciones de instalación - Página 3
Navegue en línea o descargue pdf Instrucciones de instalación para Equipamiento náutico Dowco V322 CC - 2019. Dowco V322 CC - 2019 5 páginas. 2017 g3 full / front enclosure / double canopy
STEP 4
Replace the brackets. Insert a 1 3/4" bolt from the top through the bracket and the rail. Place a barrel nut on each bolt and tighten (Figure 2).
STEP 5
Follow the same procedure for the other side.
FIG. 2
CAUTION
TO PREVENT DAMAGE TO THE TOP RAIL, IT IS RECOMMENDED TO DRILL A PILOT HOLE FIRST.
AUXILLARY BOW
FIG.3
SECONDARY BOW
RAIL
Dowco Marine, Inc. | 1610 Frisco Road, Lebanon MO 65536 | dowcomarine.com | (800) 404-5252
3
SIDE ASSEMBLY
AFT
DECK BUTTON DETAIL
1
CROWN
D
4
C
2
B
A
BOW
MAIN BOW
5
HOLD DOWN ARM
140304-00 | 06/18