Dowco X24RC Instrucciones de instalación - Página 3

Navegue en línea o descargue pdf Instrucciones de instalación para Equipamiento náutico Dowco X24RC. Dowco X24RC 5 páginas. 2019 g3 full / front enclosure / double canopy

FIG. 2
CAUTION
TO PREVENT DAMAGE TO THE TOP RAIL, IT IS RECOMMENDED TO DRILL A PILOT HOLE FIRST.
AUXILLARY BOW
FIG. 3
SECONDARY BOW
RAIL
BOW CANOPY & BOW CANOPY FRAME ASSEMBLY (FIGURE 3)
STEP 1
Insert crown pieces (1) into side assemblies (2), making sure that the bend in the center of the mid-frame is to the top following the curve of
the frame.
STEP 2
After each side assembly has been inserted into each crown piece, secure each split with the provided 1/2" self drilling screws by drilling
tthrough the crown into the stakes of the side assemblies.
STEP 3
With two people take the bow frame assembly onto the boat and insert the main bow tube into the previously installed bow H bracket (A).
Using two provided 5/ 1 6"x2" bolts, lock washers and tri-wing knobs secure the frame to the rail (Figure 2).
STEP 4
Once the frame is secure raise the assembly up and latch the hold-down arm (4) to the deck buttons (B) (Figure 2).
STEP 5
Lay the secondary and aux bows toward the aft of the boat. Zip the front pocket of the bow canopy to the main bow (5). Release the hold down
arms (4) and zip the bow canopy to the aft canopy. Push up the aux bow and zip to pocket - push the secondary bow up and zip to pocket.
Dowco Marine, Inc. | 1610 Frisco Drive, Lebanon MO 65536 | dowcomarine.com | (800) 404-5252
3
SIDE ASSEMBLY
AFT
DECK BUTTON DETAIL
1
CROWN
D
4
C
2
B
A
BOW
MAIN BOW
5
HOLD DOWN ARM
140298-00 | 06/18