Follett Horizon Elite 1810 Series Manual de instrucciones de instalación - Página 10
Navegue en línea o descargue pdf Manual de instrucciones de instalación para Fabricador de hielo Follett Horizon Elite 1810 Series. Follett Horizon Elite 1810 Series 17 páginas. Ice machine models with ride technology
También para Follett Horizon Elite 1810 Series: Manual de instrucciones de instalación (13 páginas), Manual de inicio rápido (8 páginas), Manual (8 páginas)
Connect utilities to docking assembly.
6.1
Water and drain
➋
➏
3/4" barb x 3/4" FPT
➍
➎
1" Stand pipe/Drain
• Rough-in ice machine potable water
supply
➊
. 3/8" push-in connection will be
made at included shut-off valve then at
back of docking station into solenoid.
• Remove access panel if necessary
• Connect the silicone tubing to the ice
machine 3/4" drain barb
• Assemble the 3/4" barb x 3/4" FPT to the
3/4" MPT x 1" slip. Connect the other end
of the silicone tubing to the 3/4" barb
• Connect the 1" slip fitting to the 1" stand
pipe/drain
➎
.
Note: Minimum 8" radius on silicone
drain line. Drain line from the ice machine
must have at least 1/4" per foot pitch
(6,4mm/0,3m).
• Apply Petrogel to barbed drain fitting
• Replace access panel.
10
➊
➌
Minimum 8"
radius
2 ft. x 1" OD
silicone tubing
3/4" MPT x 1" slip
➋
.
➌
.
➍
.
➏
External connections
Chassis drain plumbing - required
• Plug must be removed from John Guest
fitting.
• Route 3/8" drain tubing through knockout
in back of docking station and insert fully
into John Guest fitting connection at the
rear of the machine chassis. Route other
end of 3/8" drain tubing to drain.
• Drain must slope 1/4" inch per foot (6 mm
per 30,4 cm).
6.2
Refrigerant
➊
• Braze supplied quick-connect lines onto
stub-ins
remote condensing
➊
.
DROP-IN • RIDE Technology
6