AMQ MONITOR ARM Manual de instalación - Página 3
Navegue en línea o descargue pdf Manual de instalación para Bastidores y soportes AMQ MONITOR ARM. AMQ MONITOR ARM 7 páginas.
INSTALLATION
Step 1
Preparations before installing monitor:
1. Make sure there are 100x100mm or 75x75mm VESA holes in the monitor.
If not, the mount can't be installed.
2. Remove the original fixed base of monitor, taking care not to scratch the screen.
amqsolutions.com
MONITOR ARM INSTALLATION GUIDE | 3