DQ HEATING Moto Horizontal Instrucciones de fijación - Página 3

Navegue en línea o descargue pdf Instrucciones de fijación para Calentador DQ HEATING Moto Horizontal. DQ HEATING Moto Horizontal 4 páginas.

DQ HEATING Moto Horizontal Instrucciones de fijación
M-4
M-5
Compact valve connection:
Please note this section if your
radiator has a compact valve.
NOTE: If your product is equipped with a
compact valve, there are 2 conduit couplings
in addition to the contents.
50 mm axis H valve
assembly sequence
Thermostatic
sensor installation:
Please note this
section if your
radiator has a
thermostatic
sensor.
T-1
If thermostatic sensor is not used,
thermostatic core cover can also be
used for valve purposes.
58
50
Compact Connection
T-1
T-2
Pull out the thermostatic core cover
which comes with the product.
28.11.2019 Rev:04
R.EYS.KK.00142
Position the product on
the brackets so that
the collectors pass
through the channel on
Lock the bracket by inserting
the bracket into the slots on
the upper brackets of
radiator as shown.
C-1
C-1
Do not use linen or teflon as the sealing element
while mounting the connection fittings.
C-2
Do not apply more than 18 Newton meters.
* Do not use the pipe wrench, it may damage the product and apparatus.
C-3
After the installation, apply force to the nuts.
Do not exceed 18 Nm.
C-2
T-2
T-3
Before mounting the sensor, make sure that
the adjustment mark on the sensor is placed
above the sensor. Mount the thermostatic
sensor on the valve and press in the
direction of the arrow until you hear a click.
2
M-4
the brackets.
M-5
C-3
clik!
T-3