Draper Foundation Manual de instalación - Página 15

Navegue en línea o descargue pdf Manual de instalación para Pantalla de proyección Draper Foundation. Draper Foundation 17 páginas. Foundation for led panels

Draper Foundation Manual de instalación
Foundation
for LED Panels
Section 13 - Attaching LED Panels LED Cabinets
Section 13.1 - Attaching Spring-Loaded Fasteners
1. Replace the mounting bolts
in the LED cabinet with the provided
(pre-installed by LED manufacturer)
Spring Loaded mounting studs.
Section 13.2 - Attaching LED Panels
1. Starting in the bottom left corner, insert the four
(4)
Spring-Loaded Mounting studs into the angled slots on
the vertical rail as shown.
The head of the studs will engage with the back side of
the vertical rail and the spring washer will remain on the
front face
.
(does not fit through the slot)
Once the head of all 4 studs are fully inserted, lower the
panel into the final location.
START
SEATED

BACK VIEW

page 28 of 32
C202.044
M10 Spring Loaded
Mounting Stud
BACK VIEW
NOTE: All 4 mounting studs must be fully
seated at the bottom of the slot.
Foundation
for LED Panels
2. Attach the next LED cabinet direct to the right of the first. Continue until the first row is complete.
3. Working from left to right, attach the row of LED cabinets.
4. Continue until all LED cabinets are installed.
BACK VIEW
NOTE: All 4 mounting studs must be fully seated at the bottom of the slot.
page 29 of 32
START
SEATED
BACK VIEW