BD FACSAria Procedimiento de arranque, control de calidad y parada - Página 2
Navegue en línea o descargue pdf Procedimiento de arranque, control de calidad y parada para Instrumentos de medida BD FACSAria. BD FACSAria 9 páginas.
También para BD FACSAria: Manual rápido (5 páginas)
1
Turn ON water bath.
3
Lauda E100: turn the power switch to on.
Thermo: Press the power button followed by the "enter" button.
on/off
Lauda E100 water bath
1
Restart computer and Login
4
Username: Administrator or Admin
Password: BDIS
1
Turn ON FACSAria™ sorter.
5
Once computer is fully on - press the two buttons on the left side
of the FACSAria™. Make sure to turn ON the Main Power first and
then the Laser Switch button.
1
Launch OBIS/Coherent Connection Software
6
2
Aria-2: Coherent Connection. UV Laser typically does not start.
Set to 5 mW and press start. Once started, set to 60 mW
Aria-4: Does not have Laser connection software.
Aria-7: Does not have Laser connection software.
Coherent Connection on Aria-2.
Look for 355 nm laser and
power to 60 mW.
1
Launch Diva Software.
7
Login name: YourName
Password: ID#
1
Wait for connection.
8
Choose "Use CST settings" in the dialog box that comes up
Thermo water bath
Check OBIS/Coherent Connection SOP
.
enter
power button 1
st
.
Main Power
Laser Switch