Draytek VigorSwitch P2121 Manual de inicio rápido - Página 8

Navegue en línea o descargue pdf Manual de inicio rápido para Interruptor Draytek VigorSwitch P2121. Draytek VigorSwitch P2121 14 páginas. L2 managed gigabit switch
También para Draytek VigorSwitch P2121: Manual de inicio rápido (15 páginas)

Draytek VigorSwitch P2121 Manual de inicio rápido
P
a
P
a
PoE for Port 1 to Port 8
Status
LED
PoE/Alert
On (Green) Devices connected over the PoE maximum
Blinking
(Green)
Off
On (Green)
Blinking
SYS
(Green)
Off
On (Green) The port is supplied with PoE power.
PoE 1~8
Off
On (Green) The device is connected with 1000Mbps.
RJ 45 LNK/ACT
Port 1 ~ 8
On
(Amber)
Blinking
Off
On (Green) The device is connected with 1000Mbps.
Combo for Port
9 ~ 12
On
(RJ 45
(Amber)
LNK/ACT)
Blinking
n
e
l
E
x
n
e
l
E
x
RJ45 LNK/ACT
Port 1 to Port 8
Explanation
power budget.
More than 80% of maximum power budget is
supplied for PoE device(s).
Devices connected within the PoE maximum
power budget.
The switch finishes system booting and the
system is ready.
The switch is powered on and starts system
booting.
The power is off or the system is not ready /
malfunctioning.
No PoE power is supplied on the port.
The device is connected with 10/100Mbps.
The system is sending or receiving data
through the port.
The port is disconnected or the link is failed.
The device is connected with 10/100Mbps.
The system is sending or receiving data
through the port.
2
p
l
a
n
a
t
p
l
a
n
a
t
Combo
Port
i
o
n
i
o
n
SFP
LNK/ACT