Anchorlift Barracuda 900 Manual del usuario y manual de instalación - Página 5
Navegue en línea o descargue pdf Manual del usuario y manual de instalación para Equipamiento náutico Anchorlift Barracuda 900. Anchorlift Barracuda 900 16 páginas. World class windlass system
Preparation:
The windlass is to be placed in the correct position by aligning the gypsy with the bow. The rope or chain needs to be
level with the deck and wound around the gypsy at an angle of about 180 degrees.
(See photo P 3)
P 3
Before drilling holes, you must check the following:
1) There are to be no obstacles below the deck. There must be enough space for the chain/rope (Rode Kit) to fall
properly 12-18 inches.
2) Make sure the top and bottom surfaces of the deck are as parallel as possible. If necessary, compensate for any
differences to prevent windlass base & gearbox from being damaged.
3) Once the ideal position has been found, place the drilling/mounting template in position and mark all the holes.
Barracuda, Dolphin & Mako models are equipped with 8mm stainless steel bolts. When installing the windlass use a
10mm drill bit for the bolt holes.
Before installing turn the windlass over and supply a suitable bead of sealant as shown below.
TM
P 6
P 5
Installation
P 7
3
www.anchorlift.com