CommScope 760082529 Instrucciones de montaje - Página 2
Navegue en línea o descargue pdf Instrucciones de montaje para Bastidores y soportes CommScope 760082529. CommScope 760082529 5 páginas. 4-post equipment rack

860421239
Instruction Sheet
Parts List
Verify parts against the parts list below:
Quantity
Steel Rails
Aluminum Rails
4
4
2
2
2
2
1
1
1
1
24
24
24
24
24
24
–
40
40
–
40
–
1
1
* Recommended torque for 12-24 and M6 screws is 30 in-lb. (3.4 N-m).
Step 1 – Assembly of Vertical Rack Rails
Lay two vertical rack rails on the floor with flanges facing each other.
1.
Position one extruded base angle and one extruded top angle on the vertical rack rails as shown in the
2.
following figure.
Insert six 3/8 x 16 x 1" hex head bolts, 3/8 lock washers, and 3/8 hex nuts. Hand-tighten only.
3.
Repeat for second set of vertical rack rails.
4.
Page 2 of 5
Description
Vertical rack rails
Extruded base angles
Extruded top angles
Base pan
Upper support plate
3/8-16 x 1" hex head bolts
3/8-16 split lock washers
3/8-16 hex nuts
12-24 x 1/2" mounting screws*
M6 x 12 mounting screws*
M6 cage nuts
Instruction sheet