Atlantic alfea S8 Manual de instrucciones - Página 8

Navegue en línea o descargue pdf Manual de instrucciones para Bomba de calor Atlantic alfea S8. Atlantic alfea S8 16 páginas. Alféa s series heat pump air/water split, single service

Split system
3.2

Appliance start up.

• The installation and 1st start up of the appliance
must be done by a qualified installer. That person will
also give you instructions on starting and running the
appliance.
• Ensure that the installation is fully filled with water
and has been correctly bled and that there is a
sufficient pressure of 1.5 to 2 bars on the manometer
(Ref. 2, figure
4).
• Close the installation's main circuit breaker.
In winter, so that the compressor can be
preheated, close the installation's main circuit
breaker (outdoor unit's power supply) some
hours before pressing the on/off button.
figure 3 - Opening the door
1
2
3
1.
User interface
2.
Manometer (installation
hydraulic pressure)
3.
Start/stop switch
figure 4 - Start-up
figure 5 - Selecting the heating mode (AUTO)
and selecting the DHW operating mode
- 8 -
xxx xxx xxx
xxx xxx xxx
Xx xxx xxx
xxx xxx xxx
xxx xxx xxx
Xx xxx xxx
xxx xxx xxx
xxx xxx xxx
Xx xxx xxx
3.3

Quick start-up

Once your installer has started your installation for the
first time :
• Engage the start/stop switch.
During
the
regulator
the display shows all the symbols and then
"Data, update" and then "State heat pump".
• Select the "AUTO" heating mode
• Select the DHW mode
If the installation is fitted with a DHW tank with electrical
back-up heating :
• Set the current date and time
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Time of day and date
Operator section
Time of day and date
Hours / minutes
Time of day and date
Hours / minutes
figure 6 - Setting the time and the date
initialisation
(figure
5).
(figure
5).
(figure
6).
Press OK
Choose menu
Time and date
Press OK
Select line:
Hours / minutes
or Day / Month
or Year.
Press OK
Make all
the settings
Press OK
to confirm
each setting.
Press heating mode key
to return to basic display
(n°1, figure
7).
Operation manual "1328 - EN"
phase,