Atlas Copco PHE 16 RL-N Instrucciones de reparación - Página 6

Navegue en línea o descargue pdf Instrucciones de reparación para Taladro Atlas Copco PHE 16 RL-N. Atlas Copco PHE 16 RL-N 6 páginas.

1
Mounting the
Mount the six disc springs (2) opposite
gear box
each other (see illustration).
2
Fasten the gear boy (7) with screws (6).
3
Move the hammer switch lever (1) to the
neutral position (30° before drill position).
4
Fit the mounting cone (8) (see illustration).
5
Insert the spring (3), the discs (4), the
teflon-coated disc (5), as well as the other
discs.
1
Assembling the
Mount the sleeve (2).
drill spindle
2
Fit the sealing ring (3) with aid of a
mounting cone. The locating distance
must be 3.5 ± 0.2 mm.
3
Insert two balls into the drill spindle (1).
4
Fit the jumper ring (7) and the spacer (8),
and mount the spring (6).
5
Mount the nosepiece.
6
Fit the sleeve (5). Mount the spring ring (4).
Test Run
Check the direction of rotation!
Let the machine run-in.
Electrical Test
Perform an electrical test on the machine (see chapter Electrical and Mechanical Test Instructions).
Repair Instructions No.166.11/95
PHE 16 RL-N / PHE 20 N
1
Ø22
38
23
2
1
2
3
4
7
6
8
Ø26
+0,2
Ø20
+0,2
70
Ø26
-0,1
55
Ø33,5
3
8
7
6
5
PAGE
5
4
5
5
6
4