Mounting
Junction Box
1. Pull the wire through the wall and out of the junction box,
leaving about six inches free.
2. Pull the wire through the hole in the base plate.
3. Secure the base to the box using the #6-32 x 1/2 inch
mounting screw provided.
4. Terminate the unit according to the guidelines in the
Termination section of this manual.
5. Attach cover by latching it to the top of the base, rotating
the cover down and snapping it into place.
Drywall Mounting
1. Place the base plat against the wall where you want to
mount the sensor.
2. Using a pencil, mark out the two mounting holes and the
area where the wires will come through the wall.
3. Drill two 3/16" holes in the center of each marked
mounting hole. Insert a drywall anchor into each hole.
4. Drill one 1/2" hole in the middle of the marked wiring area.
5. Pull the wire through the wall and out of the 1/2" hole,
leaving about six inches free.
6. Pull the wire through the hole in the base plate.
7. Secure the base to the drywall anchors using the #6 x 1
inch mounting screws provided.
8. Terminate the unit according to the guidelines in the
Termination section below.
9. Attach cover by latching it to the top of the base, rotating
the cover down and snapping it into place.
10. Secure the cover by backing out the lock-down screws
using a 1/16" Allen wrench until they are flush with the
bottom of the cover (Figure 1).
NOTE: In a wall-mount application, the mixing of room air
and air from within the wall cavity can lead to erroneous
readings, condensation, and premature failure of the
sensor. To prevent this condition, plug the conduit hole with
insulation in the junction box.
IM 1199
Figure 1: Junction Box and Drywall Mounting
Termination
The field supplied wire is recommended to be a twisted pair
of at least 22 AWG and sealant filled connectors for all wire
connections. Large gauge wire may be required for long runs.
All wring must comply with the National Electrical Code
(NEC) and local codes. DO NOT run the wiring in the same
conduit as the AC power wiring. Power wiring in the same
conduit will result in inaccurate temperature readings along
with signal levels. Install the lugs below the bus bar to assure
anti-rotation.
Figure 2: Wire Connections