Anolis ArcSource Outdoor 4 MC Instrucciones de uso - Página 6

Navegue en línea o descargue pdf Instrucciones de uso para Luminaria Anolis ArcSource Outdoor 4 MC. Anolis ArcSource Outdoor 4 MC 8 páginas.
También para Anolis ArcSource Outdoor 4 MC: Instrucciones de uso (8 páginas)

8. Installing the ArcSource Outdoor 4 MC onto a land spike
Land spike 1 ASO 4 MC 100mm / Land spike 2 ASO 4 MC 100mm
1. Hammer the sharp part (1) of the land spike into ground
(hammer the centre of the sharp part, not the edge).
2. Screw the threaded bar (2) into the sharp part (1) and
secure it with the socket head M5x5 (3).
3 .Put the cover (4) on the threaded bar (2).
4. Put the pipe 36.5 mm (5) on the threaded bar (2).
5. Put the cable holder (6) on the threaded bar (2).
Land spike 1 ASO 4 MC 100mm only.
6. Screw the nut (7) on the threaded bar (2).
7. Screw the ArcSource Outdoor 4 MC on the nut (7).
(Use the socket head M5x14 from the ArcSource Outdoor
4 MC to screw it to the nut (7)).
8. Pass the cable throw the cable holder (6).
Land spike 2 ASO 4 MC 100mm only.
6. Put the pipe 42 mm (6) on the threaded bar (2).
7. Put the ArcSources holder (8) on the threaded bar (2).
8. Screw the nut (9) on the threaded bar (2).
9. Screw both ArcSource Outdoor 4 MC on the ArcSources
holder (8).
(Use the socket heads M5x14 from the ArcSource Outdoors
4 MC to screw them to the holder (8)).
10. Pass the cable throw the cable holder (6).
Land spike 1 ASO 4 MC 500mm / Land spike 2 ASO 4 MC 500mm
1. Hammer the sharp part (1) of the land spike into ground
(hammer the centre of the sharp part, not the edge).
2. Screw the threaded bar (2) into the sharp part (1) and
secure it with the socket head M5x5 (3).
3 .Put the cover (4) on the threaded bar (2).
4. Put the pipe 36.5mm (5) on the threaded bar (2).
5. Put the cable holder (6) on the threaded bar (2).
6. Put the pipe 198mm (7) on the threaded bar (2).
7. Put the cable holder (6) on the threaded bar (2).
8. Put the pipe 198mm (7) on the threaded bar (2).
Land spike 1 ASO 4 MC 500mm only:
9. Put the cable holder (6) on the threaded bar (2).
10. Screw the nut (8) on the threaded bar (2).
11. Screw the ArcSource Outdoor 4 MC on the nut (8).
(Use the socket head M5x14 from the ArcSource Outdoor
4 MC to screw it to the nut (7)).
12. Pass the cable throw the cable holders (6).
Land spike 2 ASO 4 MC 500mm only:
9. Put the ArcSources holder (8) on the threaded bar (2).
10. Screw the nut (9) on the threaded bar (2).
11. Screw both ArcSource Outdoor 4 MC on the ArcSources
holder (8).
(Use the socket head M5x14 from the ArcSource Outdoors
4 MC to screw them to the holder (8)).
12. Pass the cable throw the cable holders (6).
6