DS Stoves Stoker Manual del usuario - Página 13
Navegue en línea o descargue pdf Manual del usuario para Horno DS Stoves Stoker. DS Stoves Stoker 17 páginas. High efficiency auger fed rice coal furnace
Seal Point
Fig. 14
Coal Storage
1 - Provide an adequate amount of coal
storage for your boiler. Preferably
indoors in the form of an optional
manufactured coal hopper or coal bin
within the same room as your boiler.
Ideally your coal bin will be located so
that your coal supplier can access your
coal bin from the exterior of your
building. We recommend that you
contact your local coal supplier for
recommendations on this matter.
2 - If you purchased the optional 500 lb
coal hopper that is available with this
stoker boiler it gets attached to the end
of the short auger coming out of boiler.
This can be located on either the right
or left side of boiler. Make sure you put
sealant around auger pipe where it enters
hopper. Because of carbon monoxide keep hopper lid
closed when not loading coal. (very important)
3 - Never hook 55 gallon barrel or coal bin to short hopper
that gets shipped with boiler, because of carbon
monoxide you must add either 5' or 8' auger option
For coal bin option we recommend you build a
coal bin feed trap see drawing at right.
If using a 55 gallon barrel for coal hopper,
it must have a sealed lid.
Example of 5' or 8' Auger Options
Fig. 16
13
Seal Point
Seal Point
Seal Point
2-5/16 x 1 SS
Carriage Bolts with
2-5/16 SS washers and
2-5/16 SS nuts
Seal Point
All joints
must be
sealed
with 641
Seal-It-Right
sealer
Fig. 15
Seal Point