DS18 CF-X8TP Manual del usuario - Página 8

Navegue en línea o descargue pdf Manual del usuario para Equipamiento marino DS18 CF-X8TP. DS18 CF-X8TP 12 páginas. 8" marine towers with integrated rgb led lights and carbon fiber finish

DS18 CF-X8TP Manual del usuario
/ INSTALACIÓN
BEGINNING MOUNTING
Step 1: Remove tower speakers from the packaging
and ALL hardware.
Step 2: Find a GOOD location that allows for easy
wiring of the speaker (and LED lights) -PLUS does
NOT impair your movement around the location.
Step 3: Using the supplied 6mm hex wrench spin
out the 4-M8 screw that holds the top clamp
Step 4: Drill 15 - 20 mm hole on mounting tube
bottom align the clamp wire out hole.
Step 5: Connect the speaker wire AMP out and LED
controller, Insulated lock the clamp to the tube.
Step 6: Cut the length of the rubber pad and wires
outlet according to the diameter of the installation
pipe.
3.0"
2.75"
2.5"
2.25"
2.0"
1.75"
1.5"
1.25"
1.0"
RUBER PAD FOR TUBE
Paso 6
cables de altavoz
304 pernos M8 con
arandela de tope de resorte
Paso 3
Soldadura, tubo termorretráctil
Paso 5
COMENZANDO EL MONTAJE
Paso 1: Retire los altavoces de torre del embalaje y TODO
el hardware.
Paso 2: Encuentre una BUENA ubicación que permita el
cableado fácil del altavoz (y las luces LED) - ADEMÁS QUE
NO perjudique su movimiento alrededor de la ubicación.
Paso 3: Con la llave hexagonal de 6 mm suministrada,
gire el tornillo 4-M8 que sujeta la abrazadera superior.
Paso 4: Perfore un orificio de 15ø - 20ø mm en la parte
inferior del tubo de montaje y alinee el orificio de salida
del cable de la abrazadera.
Paso 5: Conecte el cable de salida AMP del altavoz y el
controlador LED, trabe la abrazadera aislada al tubo.
Paso 6: Corte la longitud de la almohadilla de goma y la
salida de los cables de acuerdo con el diámetro de la
tubería de instalación.
Cable de 6 hilos
Llave hexagonal
de 6 mm
Paso 4