AddEnergie SmartTWO Manual de instalación - Página 14
Navegue en línea o descargue pdf Manual de instalación para Cargador de batería AddEnergie SmartTWO. AddEnergie SmartTWO 20 páginas.
También para AddEnergie SmartTWO: Manual de inicio rápido (4 páginas)
Wall Mount
Double unit installation
INSTRUCTIONS:
• Identify which sides of the main structure
must be assembled face to face and
remove their corresponding bolts and
screwed plates.
• Place the main structures one against
the other and join using the four (4)
longest carriage bolts you just removed.
• Make sure that the available height is a minimum of
216 cm (85")
• If the wall requires that anchors to be pre-installed,
follow the drilling pattern provided on right
• Install the base on the wall using the proper type of
anchors, which means ½-13 inserts and bolts for
a concrete wall, or ½ lag bolts for a wooden wall.
• Before drilling and during the installation of the base
on the wall, make sure that everything is leveled
© 2019 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED Information and specifications contained in this document are subject to change, amendments and additions at any time, without notice
Patron de perçage:
Drilling pattern:
8.3 cm
(3.25'')
21 cm
(8.25'')
74 cm
(29'')
SOL
GROUND
14