AddEnergie SmartTWO Manual de instalación - Página 18

Navegue en línea o descargue pdf Manual de instalación para Cargador de batería AddEnergie SmartTWO. AddEnergie SmartTWO 20 páginas.
También para AddEnergie SmartTWO: Manual de inicio rápido (4 páginas)

Installation of the Panel on the Charging Head

• Slide the panel holder onto the charging station head as shown in
• Attach the panel(s) to the panel holder. Only one is required for a wall
• For a double or quadruple installation screw the adjacent panel
WALL MOUNT
Simple / Single
PEDESTAL
Simple / Single
2 Panels
© 2019 ADDÉNERGIE TECHNOLOGIES INC. ALL RIGHTS RESERVED Information and specifications contained in this document are subject to change, amendments and additions at any time, without notice
the image on the left (at this stage, the panel holder is not attached
to the head but simply clipped to it).
mount installation and two are required for a pedestal installation.
holders together, as shown on the image to the right.
Simple / Single
1 Panel
Single
(1 panel)
Simple / Single
2 Panels
Single
Double / Double
Simple / Single
(2 panels)
2 Panels
2 Singles Panels + 1 Double Panel
Double / Double
2 Panels
2 Singles Panels + 1 Double Panel
Double / Double
2 Panels
Double / Double
Simple / Single
2 Singles Panels + 1 Double Panel
Double / Double
2 Singles Panels + 1 Double Panel
Screw the two panels holders together.
Double
(2 panels)
2 Panels
2 Singles Panels + 1 Double Panel
Double
(2 singles panels + 1 double panel)
Screw the two panels holders together.
Double / Double
Screw the two panels holders toget
Screw the two panels holders
18