AIRTUG TT-5W-SD-GM Instrucciones de montaje y uso - Página 3

Navegue en línea o descargue pdf Instrucciones de montaje y uso para Maquinaria agrícola AIRTUG TT-5W-SD-GM. AIRTUG TT-5W-SD-GM 5 páginas.

Assembly Instructions
Tools Needed For Assembly: Wire cutter, utility knife,
5/16", 9/16", 11/16" sockets or wrenches.
Assembly Note: All reference to "right" and "left"
orientation is made while standing behind the tug and
looking forward from the operating position.
Remove shrink wrap.
In addition to the tug and the the handle, the following
parts are included.
1. One (1) Quart of Oil
2. Two (2) Zip Ties (Large)
3. Spark Plug Wrench
4. Spare Oil Drain Plug
5. Muffler Deflector
Step 1: Cut throttle cable zip tie at front of motor and
bring around and back along right side of U-bolts.
Cut transmission cable, bring around engine and along
left side of U-bolts.
Step 2: Install the handle all the way through second
"U" bolt. Push the handle approximately 1 1/2" beyond
the second "U" bolt. If it appears the handle will not fit
through the "U" bolt, loosen the nuts below. Once the
handle is installed, tighten nuts securely.