3onedata IES206G-2GS-P Manual del usuario - Página 3
Navegue en línea o descargue pdf Manual del usuario para Enrutador de red 3onedata IES206G-2GS-P. 3onedata IES206G-2GS-P 4 páginas. Industrial ethernet switch
ON
Power 2 is working normally.
PWR2
PWR2 is not connected or run
OFF
normally.
ON
SFP slot Port connection is active
Blinking
Data transmitted
G1~G2
OFF
SFP slot Port connection is not
active
Network
connection
ON
Electronic port is valid
Blinking
Data is being transmitted
Network
connection
Link1~4
OFF
Electronic port is invalid
1000M speed
100M speed
10M speed
【Installation】
Before installation, confirm that the work environment meet the
installation require, including the power needs and abundant
space. Whether it is close to the connection equipment and other
equipments are prepared or not.
1. Avoid in the sunshine, keep away from the heat fountainhead or
the area where in intense EMI.
2. Examine the cables and plugs that installation requirements.
3. Examine whether the cables be seemly or not (less than 100m)
according to reasonable scheme.
4. Power: 12-48VDC power input
5. Environment:working temperature: -40~75℃
Storage Temperature: -40~85℃
Relative humidity 5%~95%
DIN Rail Installation
In order to use in industrial environments expediently, the product
adopt 35mm DIN-Rail installation, the installation steps as below:
1. Examine the DIN-Rail attachment
2. Examine DIN Rail whether be firm and the position is
suitability or not.
3. Insert the top of the DIN-Rail into the slot just below the
stiff metal spring.
4. The DIN-Rail attachment unit will snap into place as shown
below.
of
the
of
the
Wiring Requirements
( : ON,
: OFF)
Cable laying need to meet the following requirements,
1. It is needed to check whether the type, quantity and
specification of cable match the requirement before cable
laying;
2. It is needed to check the cable is damaged or not, factory
records and quality assurance booklet before cable laying;
3. The required cable specification, quantity, direction and
laying position need to match construction requirements, and
cable length depends on actual position;
4. All the cable cannot have break-down and terminal in the
middle;
5. Cables should be straight in the hallways and turning;
6. Cable should be straight in the groove, and cannot beyond the
groove in case of holding back the inlet and outlet holes.
Cables should be banded and fixed when they are out of the
groove;
7. User cable should be separated from the power lines. Cables,
power lines and grounding lines cannot be overlapped and
mixed when they are in the same groove road. When cable is
- 3 -
too long, it cannot hold down other cable, but structure in the
middle of alignment rack;
8. Pigtail cannot be tied and swerved as less as possible.
Swerving radius cannot be too small (small swerving causes
terrible loss of link). Its banding should be moderate, not too
tight, and should be separated from other cables;
9. It should have corresponding simple signal at both sides of the
cable for maintaining.
【Specification】
Technology
Standard:
Support
IEEE802.3,
IEEE802.3u,
IEEE802.3ab, IEEE802.3z
Flow control: IEEE802.3x flow control, back press flow control
Exchange attribute
100M forward speed: 148810pps
1000M forward speed: 1488100pps
Transmit mode: store and forward
System exchange bandwidth: 12Gbps
MAC address table: 1K
Memory: 1Mbit
Interface
Gigabit Ethernet port: 10Base-T/100Base-TX/1000Base-TX auto
speed control, Half/full duplex and MDI/MDI-X auto detect
Gigabit SFP port: 1000Base-X, SFP slot
Transfer distance
Twisted cable: 100M (standard CAT5/CAT5e cable)
Multi-mode: 1310nm, 2Km
Single-mode: 1310nm, 20/40Km
1550nm, 60/80/100/120Km
LED indicator
Ethernet port indicator: 1, 2, 3, 4
Gigabit SFP port indicator: G1, G2
Ethernet port speed indicator: 10M, 100M, and 1000M
Power supply indicator: PWR1/PWR2
IEEE802.3x,