Installation Steps

1. Review materials in box, including the CAD drawing and installed location of the DuctSox
2. Prepare metal inlet collar for fabric connection
3. Mark placement of track. (1 Row, 2 Row, and 3 Row Style) Install track (with couplers and track supports
OR surface mount clips)
4. Install and assemble DuctSox components
5. Start up AHU
6. Balance airflow
Step 1
Review materials in box, including the CAD drawing and installed location of the DuctSox. READ
INSTRUCTIONS THOROUGHLY BEFORE BEGINNING.
Step 2
Prepare metal inlet collar for fabric connection.
• Confirm inlet air supply location.
• Confirm inlet air supply size.
• DuctSox inlets are manufactured 1/2" (12mm) larger than
specified to fit over metal inlet collar.
• Metal collar length should be 6"–10" (150 to 250cm) for
secure fabric attachment.
• Edge Guard (provided) should be installed on the edge of
the metal collar to reduce fabric wear from the metal edge.
Step 3
Mark Placement of Track. Step 3 is broken into three types of suspension points: 1 Row, 2 Row, and 3
Row. One job may use multiple styles.
Step 3 – 1 Row Style
3
Step 3 – 2 Row Style
10 and 2 O'clock
6"–10"
(150 – 250cm)
Edge Guard
(Supplied)
Step 3 – 3 Row Style
10, 2, and 12 O'clock