Anzzi SB-AZ011WC Manual de instalación y funcionamiento - Página 7

Navegue en línea o descargue pdf Manual de instalación y funcionamiento para Productos de fontanería Anzzi SB-AZ011WC. Anzzi SB-AZ011WC 14 páginas. Shower base
También para Anzzi SB-AZ011WC: Manual de instalación y mantenimiento (8 páginas)

Anzzi SB-AZ011WC Manual de instalación y funcionamiento
STEP 5
Apply a generous amount of mortar that
has been mixed to a thick consistency.
Place the base in the wet mortar, adjust
until it is level, and let mortar cure for
24 hours. Proceed to the next step. (Fig 5)
STEP 6
It is recommended not to stand in base
while securing to wall. Set base in corner
and press it into mortar.
Secure flanges to all studs with #8(1-1/2")
screws through previously drilled holes.
(Fig 6)
IMPORTANT: Gaps between flanges and
studs must be less than 1/8". Insert shims
to fill gaps if needed.
Mortar
Fig. 5
Shim
Fig. 6
5