3onedata IAP2600S-4A25-5GT-PD Manual de instalación rápida - Página 2
Navegue en línea o descargue pdf Manual de instalación rápida para Punto de acceso inalámbrico 3onedata IAP2600S-4A25-5GT-PD. 3onedata IAP2600S-4A25-5GT-PD 5 páginas. Industrial dual-band wireless ap
Model I
Model II
1.
Console port
2.
Reset button
3.
Running indicator
4.
2.4G signal indicator
5.
5.8G signal indicator
6.
WAN indicator
7.
LAN indicator 1-3/4 (Green)
8.
Breather valve
9.
Signal intensity indicator 2-4 or 1-3 (Blue)
10.
Wall-mounting location hole
11.
5.8G omnidirectional antenna interface
12.
2.4G omnidirectional antenna interface
13.
10/100/1000Base-T(X) copper LAN port
14.
10/100/1000Base-T(X) copper WAN port (PoE
input)
15.
10/100/1000Base-T(X) Combo WAN port (PoE
input)
【Mounting Dimension】
Unit: mm
Notice before mounting:
Don't place or install the device in area near water or
moist, keep the relative humidity of the device
surrounding between 5%~95% without condensation.
Before power on, first confirm the supported power
supply specification to avoid over-voltage damaging the
device.
The device surface temperature is high after running;
please don't directly contact to avoid scalding.
【Pole-mounted Device Mounting】
Step 1.
Use 4 M6 screws to install the clamp board as
shown in the figure below on the device backboard.
Step 2.
Align the other clamp board with the hole center
line of the installed clamp board, then place the
support pipe to align the hole center of the two
clamp boards. When the two clamps are docking, it
can choose 15° or 90° installation angle.
Step 3.
Pass the M6 long screw through the hole where the
clamp boards are docked and the support pipe, and
tighten the corresponding M6 nut.
Step 4.
Install U-shaped derrick screws and derrick teeth
on the clamp board, and put the derrick with a
diameter of Ф40mm-Ф50mm in a U-shaped slot, as
shown in the figure below.
Step 5.
Adjust device position and tighten the derrick nut to
fix the position of the device on the derrick.
Installation ends.