3P Technik VF1 Instrucciones de instalación y mantenimiento - Página 3
Navegue en línea o descargue pdf Instrucciones de instalación y mantenimiento para Sistemas de filtración de agua 3P Technik VF1. 3P Technik VF1 4 páginas. 3p volume filter
También para 3P Technik VF1: Instrucciones de uso y montaje (4 páginas)
3. Installation advice
Installation direct in ground
4. Installation
3P Volume Filter
– Connections to the 3P Volumefilter VF1
can be made with universal connectors.
– Rainwater enters through the upper Inlets,
at 110 mm. For roof areas up to 200 m
connect from either right or left.
– For roof areas above 200 m
on both sides for maximum efficiency.
– Saw off 1 cm from the outside
of the selected Inlet(s).
– Cleaned water is led via the outlet
at 110 mm to the storage tank.
– Dirty water goes via the outlet
at 110 mm to waste.
– Install the 3P Volumefilter VF1 horizontally
on a level stable surface. For deeper
installations the 3P Telescopic Extension
can be used to reach ground level.
dirt
retention
basket
infiltration
chamber
Installation of the Telescopic Extension
– Lift the lid off the 3P VF1 and lock the lower
2
– The upper surface of the upper ring collar
2
connect
– Push the upper section of the 3P Telescopic
4
5
– If the final required height is lower than
– If the final required height is higher than
– Next, back fill the tube surround with
– If installed in a block built inspection
Installation in an inspection chamber
Inlet rainwater
inspection
chamber
cleaned water
over-
flow
siphon
part of the 3P Telescopic Extension tube,
using the bayonet socket fitting,
onto the 3P Volumefilter VF1.
It has to be fully engaged.
to the upper section of the Telescopic Tube
can be fitted flush at ground level.
This leaves the VF1 lid just proud of the
ground surface for easy removal and access.
Extension on to the lower part until you
reach the required height.
the minimum with the two pieces, simply
cut by sawing the upper or the lower part
with a fret saw to the required height.
the maximum you can use a second
Telescopic Extension on top.
gravel or stone chippings.
Compress the back fill below the upper
collars of the upper extension section, so
that the collars take the loading, and not
the VF1 below.
chamber there may be no need for the
Telescopic Extension Tube, or it can be fitted
to the base of an inspection chamber floor.
storage tank
calmed inlet
03