Danfoss VLT Automation Manual de instrucciones - Página 7
Navegue en línea o descargue pdf Manual de instrucciones para Accionamientos de CC Danfoss VLT Automation. Danfoss VLT Automation 16 páginas.
Install top duct cover assembly using
the longer T25 screws provided with
the kit in the existing drive top cover
holes. Reference Photos 17, 18 and
19.
Apply the gasket to the top duct
closing plate and install. Install the
enclosure top. Reference Photos 20
and 21.
Photo 18. Top duct closing plate with gasket
Photo 20. Enclosure top installed
Instruction No: 175R5640 V3
Photo 17. Top duct installed
Aug 13, 2008
Page 7
Photo 19. Top duct closing plate in-
Photo 21. Top view of Rittal enclosure