Additel ADT927 Manual del usuario - Página 2

Navegue en línea o descargue pdf Manual del usuario para Bomba de agua Additel ADT927. Additel ADT927 2 páginas. Hydraulic pressure test pump
También para Additel ADT927: Manual del usuario (2 páginas), Manual de mantenimiento y reparación (15 páginas), Manual de instrucciones de mantenimiento (7 páginas)

Additel ADT927 Manual del usuario
Preparation
Open the reservoir
②open the upper cover
①open
The media level should be 2/3 the height
of the reservoir.
Basic Operation
Purge process
Vacuum displayed on the gauge
③turn it to the smallest degree
①close
Pressurizing process
If necessary,
please generate
Pressure Gauge
high pressure
using #4 handle
③generate high-pressure
and fine adjust pressure
②Pre-pressurization
①close
①close
Remark:
A Additel has made a concerted effort to provide complete and current information for the proper use of the equipment. The product specifications and other
:
information contained this manual are subject to change without notice.
: Above pictures are just for reference.
B
Filling/emptying the reservoir
A
Clean any impurities from the media and reservoir.
SW
V
mA
COM
Pressure Gauge
dial gauge
pressure switch
C
①open
②open
②Turn all the
way out
F
①open
②open
Additel Corporation.USA
B
Fill or empty media
Connection
24V
SW
SW
V
V
mA
mA
COM
COM
24V
24V
pressure transmitter
flexible hose
Purge process (cont.)
D
,
If air is still trapped in the pump
then repeat the purge process 2
or 3 more times until all the gas
is removed from the system.
Wait for gauge to vent to zero
bubble
③Turn all the way in
Vacuum preparation
G
0.04
0.06
Vacuum Gauge
0.02
0 .08
0
- 0.1
④turn it to the
mid position
③turn it to the
smallest
degree
www.additel.com
Lock the reservoir
①close the upper cover
②close
A
Pressure Gauge
①open
②open
Pre-pressure
Pressure Gauge
①open
②open
Vacuum process
If it is difficult to generate
vacuum pressure then
0.04
0.06
Vacuum Gauge
repeat the purging
0.02
0 .08
process to make sure all
0
- 0.1
the gas is removed from
the system.
③fine adjust
①close
C
Vent
B
Zeroing should
be operated
under this
condition only.
E
④turn it to the
mid position
③turn it to
greatest
degree
H
,
②turn it to approach
the desire value