Danfoss APP 1.5-2.5 Instrucción - Página 4

Navegue en línea o descargue pdf Instrucción para Bomba de agua Danfoss APP 1.5-2.5. Danfoss APP 1.5-2.5 6 páginas. Internal pump elements

Danfoss APP 1.5-2.5 Instrucción
20.
Position the new spring, new spring guide, new retainer guide,
new retainer plate and new pistions.
21.
Position the housing on the port flange and over the guide pin.
22.
Hold the pump together and carefully turn it over to rest on the
housing. To prevent seizing-up, lubricate the threads on the 2
screws and screw them into the port flange and the housing.
Use Molykote D paste from Dow Corning or Klüber UH1 84-201
from Klüber lubrication. Tighten the 2 flange screws to a torque
of 12+1Nm.
4
DKCFN.PI.013.EF4.02
521B0741