Danfoss PAH 10 Desmontaje y montaje - Página 7

Navegue en línea o descargue pdf Desmontaje y montaje para Bomba de agua Danfoss PAH 10. Danfoss PAH 10 20 páginas.
También para Danfoss PAH 10: Manual de instrucciones (12 páginas)

Danfoss PAH 10 Desmontaje y montaje
Instruction
2.

Inspection

Disassembling and assembling PAH 10-12.5, PAHT 10-12.5 and PAHT G 10-12.5

2.1 Port plate and valve plate

1.
Neither port plate nor valve plate must
show any sign of wear.
3.
Check that both O-rings and back-up rings
are not broken and do not show severe
wear.

2.2 Pistons

1.
The play in the ball and socket joint must
not exceed 0.1 mm.
2.
The thickness of the piston shoes must be
at least 4.1 mm.
4.
PAHT only:
It is acceptable that the (black) treated
surfaces of the pistons are partly worn off.
180R9095 / 521B0986 / DKCFN.PI.010.NA3.02 / 09.2013
2.
Hold a ruler against the surface of the
plates and check the tightness against a
light source.
3.
Hold a ruler against the surfaces of the
piston shoes to check that the surfaces are
even and smooth and without any scratches.
7