Danfoss PAHT 12.5 Desmontaje y montaje - Página 10
Navegue en línea o descargue pdf Desmontaje y montaje para Bomba de agua Danfoss PAHT 12.5. Danfoss PAHT 12.5 20 páginas.
Instruction
3.
Assembling
10
Disassembling and assembling PAH 10-12.5, PAHT 10-12.5 and PAHT G 10-12.5
WARNING:
Do not use silicone when assembling the
pump. Do not reuse disassembled O-rings;
they might be damaged. Always use new
O-rings.
1.
Lubrication:
•
To prevent seizing-up, lubricate all threads
with PTFE lubrication type.
•
O-rings inside pump may be lubricated
only with clean filtered water.
•
O-rings for port flange, mounting flange
and flushing valve must be lubricated.
•
It is important to lubricate ALL parts to be
assembled with clean filtered water
(Especially all PEEK parts).
3.
Mount the O-ring on the flange.
180R9095 / 521B0986 / DKCFN.PI.010.NA3.02 / 09.2013
Important:
It is essential that the pump is serviced in
conditions of absolute cleanliness. All parts
must be absolute clean before mounting.
2.
Parts and tools required for assembly.
Check that all parts are OK.
Replace all seals.
4.
Mount the port plate in its right position
using the pin as guide.
Guide
pin