Duratuf Garrison PL63 Manual de instrucciones de montaje - Página 3
Navegue en línea o descargue pdf Manual de instrucciones de montaje para Almacenamiento exterior Duratuf Garrison PL63. Duratuf Garrison PL63 16 páginas.
CONGRATULATIONS ON PURCHASING A DURATUF GARRISON SHED.
BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS
•
Read all instructions carefully
•
Identify all parts and check quantities against parts list
•
Select a level site
•
Do not mark cladding with pencil as lead can cause corrosion to cladding
•
During assembly, ensure all drill filings are removed between layers of steel, before riveting together
•
Do not attempt to build your shed in high winds
•
Beware of sharp edges, we recommend that you use gloves
•
Protect your eyes and ears
•
For ease of assembly, use a friend to help
DRILL
HAMMER
The following maintenance process needs to be adhered to, to qualify for the steel warranty of your Duratuf Garrison
shed.
•
Wash all surfaces annually using a hose and soft nylon brush.
•
Within 2 km of coast – wash every 3 months as above. After a storm, wash the cladding and the gutters as soon
as possible to remove any highly corrosive salt deposits.
•
Volcanic Ash Fallout – wash as soon as possible, removing fall out from roof and gutters.
•
Do not allow manures, chemicals or other corrosive materials to have direct contact with cladding
BEFORE YOU START:
SAFETY:
TOOLS REQUIRED:
RIVETER
SQUARE DRILL BIT
NAIL PUNCH
WARRANTY REQUIREMENTS:
3.5mm DRILL BIT
TAPE MEASURE
2
LADDER
HEX DRIVE
.
: