Duratuf MK4A Manual de instrucciones de montaje - Página 13
Navegue en línea o descargue pdf Manual de instrucciones de montaje para Almacenamiento exterior Duratuf MK4A. Duratuf MK4A 16 páginas. Kiwi series, base size 4.210mm x 2545mm
MK4A BARGE & SPOUTING
Step 1: Position Barge Flashing (A102) on gable
ends. Slide one Spouting (D103) inside
another until it measures the correct length.
Rivet together with four rivets. Repeat with
the other Spouting. Position Spouting on
the shed and rivet to barge Flashing at
each end. Repeat with other Spouting.
Step 1: Place shed in final position. Check the diagonal
measurements are the same and the shed is
level before fitting Floor. It is recommended that
the shed is anchored down with either a Duratuf
Bolt Down Kit or Duratuf Peg Down Kit depend-
ing on what the shed is sited on.
Step 2:
Lay a Floor Board on top of Bottom Plates and Joist and
push up against end wall. Mark out where Studs are. Cut
checkouts with Electric Jigsaw so Floor Board will fit
around Studs.
Step 3: Re-position Floor Board. Lay out remaining Floor
Boards checking around Studs as you go. The
last Floor Board may have to be cut to size.
Step 2: Centralise Barge Flashing on gable end
MK4A FLOOR
13
and rivet in place, one rivet into every
second Rib. Fit two rivets through top of
Barge into Rib. Repeat with other Barge
Flashing. Check Spoutings are straight,
then rivet to Roof one rivet every second
Rib.