Duratuf KIWI MK1A Manual de instrucciones de montaje - Página 12
Navegue en línea o descargue pdf Manual de instrucciones de montaje para Almacenamiento exterior Duratuf KIWI MK1A. Duratuf KIWI MK1A 16 páginas.
Step 1: Position Door Track (107) on front wall up against
underside of Roof, with right hand end flush with the
right hand corner. Pre-drill hole in centre and rivet in
place. Remove ALL drill filings
Step 3: Remove Door. Pre-drill holes into each Rib and at
similar spacings into Over Door Flashing. At ap-
proximately 1/3 in from each end of Door Track put
a 50mm nail. Fix rivets to rest of holes
Step 5: Bottom Door Guide: Slide Door to corner. Hang Door
Guide (108) on bottom of the Door. Make it flush with
Corner Flashing. Lift up approximately 3mm so that the
Door will Slide freely. Pre-drill hole and nail in place
using a 50mm nail. Slide to centre. Ensuring Door
slides freely, pre-drill hole and nail Door Guide in place.
Check Door is not binding in the middle then pre-drill
holes into each Rib at similar spacing into Door Step
Flashing. Nail off using 50mm nails.
Note:
For sheds with Raised Base Plate option the Door Step
Flashing will protrude down past the Bottom Plate. At-
tach Door Guide with rivets.
MK1A DOOR
Step 2: Hang door in Door Track. At the right hand end of
Step 4: Clean out ALL drill filings. Also make sure the
MK1A DOOR
DOOR
12
Door Track, adjust up or down so that the Door
hangs parallel with shed. Fit one rivet at right hand
end to hold in place. Repeat with left hand end of
track.
Nut
Washer
Aluminium
Door Stop
Wheels are cleaned of drill filings. Re-hang Door,
then insert door stops into the pre drilled holes at
end of tracks as shown in diagram. Tighten with
two spanners.
CLADDING
BOTTOM
PLATE
DOOR
GUIDE
Door Track
Washer
Bolt