DURAVANT Hamer Fischbein 2090 Instrucciones de mantenimiento - Página 2

Navegue en línea o descargue pdf Instrucciones de mantenimiento para Sistemas de enfardado DURAVANT Hamer Fischbein 2090. DURAVANT Hamer Fischbein 2090 5 páginas.

DAILY OPERATOR RUNNING CHECKS:
These tasks should be performed at the beginning of each shift and checked between roll changes:
GENERAL RUNNING INFORMATION
• Drain the Filter Water Separator Bowl if any water is present.
WARNING: DO NOT ALLOW BOWL TO BECOME FULL, CHECK HOURLY.
• Clean the machine and surrounding area of product buildup. If the machine is dusty or dirty, blow
off machine with compressed air (do not let any dust, dirt, or water get into the Electrical Panel).
WEEKLY:
These tasks should be done on a weekly schedule:
• Check tension and tracking of product feed conveyor belt. Tension or track if required.
• Inspect product gate air cylinder for leakage or wear. Replace as necessary.
• Check all gearbox's for proper lubrication fill level.
• Clean machine thoroughly to remove any product buildup which could jam moving parts on
the machine.
• Lubricate all Slide Mechanisms.
• Inspect the machine for wear. Belts, Bearings, etc. Replace parts if necessary.
• Check the machine for loose hardware. Nuts, Bolts, Screws, etc. Tighten if necessary.
• Check leveling wheel assembly for loose hardware (clamp hub, bearing setscrews, paddle
bolts).
SEASONAL MAINTENANCE:
These maintenance tasks should be performed before each packaging season:
• Replace product feed conveyor belt.
• Replace product gate air cylinder.
• Replace leveling wheel cleaning flap.
• Inspect all motors, and gearboxes for wear.
• Check all Bearings and replace any that do not operate smoothly.
• Lubricate all Slide Mechanisms.
• Change all gearbox lube.
300VF Page 2 of 2
28
Rev. 12