cayken tools 911 Manual de instrucciones - Página 4

Navegue en línea o descargue pdf Manual de instrucciones para Taladro cayken tools 911. cayken tools 911 8 páginas.

7.Dress correct protection clothes Cannot wear very confortable clothing or wear je-
welry, otherwise be twined very much by the revolving part of machine occur danger.
Manipulator ware , suggest to put on ear shield and rubber gloves , wear to guard
against slippery shoes in enter the plate of long hair safety helmet.
8.If inconvenience. May install machine connection to aspiration.
9.Cannot use line cable to do other use cannot use line cable to drag Ye machine, can
not Ye line cable pulls out plug.
10.Cannot over bend waist , avoid that body adopts unusual attitude. Ensure you to
stand position safety maintains body balance.
11.Please protect your machine properly, in order to make it develop function norm-
ally when it is working. Please follow working instruction when changing tool. Of-
ten inspect machine from tape line cable , ensure to have no breakage, maintaining
handle to be dryed have no oil.
12.Machine does not use for a long time, before defending machine or before chang-
ing bit, please pull out the plug of power source.
13.Cannot stay in the spanner of handling bit bit is above, before starting machine,
ensure that spanner has left bit.
14.Avoid accident start machine. When moving to put through the machine of power
source , cannot put finger on switch. Ensure that before plug is being inserted into
socket, machine switch is in the location that stops.
15.In outdoor manipulator ware, please use the cable of extension line that accords
with safe requirement.
16.In unit process of cargo bandling must notice concentration, do not when excess-
iveness tiredness, after wine, finish drill with the condition of taking medicine to
make tool.
17.The type of generator speed adjustment or gear speed adjustment in work please
select the adaptive bit of appearance, and open speed most quickly, so machine
reach best state. If rig in working process rock , must close machine to inspect the
concentric degree of bit and main shaft , can damage machine otherwise to occur
danger.
18.Pay attention: For your personal benefit, please choose original factory accessory
Is not original factory accessory if choosing , will may produce injury for operator
or the very machine.

PREPARATORY STAGE

It may use additional tool , is completed in order to go off work to do if please
install and join you according to step for diamond drilling machine.
Pay attention: Before joining , must guarantee that the switch of main
computer is in the state that stops.
Step 1: Comparing with the inspection of container load plan, machine and parts
open package, inspect machine in transportation process, whether damage ,
inspection the voltage of building site whether the voltage that shows on name plate
is consistent, contrast container load plan sees the attachment in package whether is
complete.
Step 2: Power source joins , according to a standard EN61029 and a IEC1029-2 6
of European Union, taking the diamond drilling machine of water schoolwork must
add to pack the protector of leakage of electricity ,the socket of power source must
carry out earthing. It is consistent with these safe rules, our product matches have
packed the protector of leakage of electricity, its function ,including leakage of
electricity are protected untie with under-voltage to deduct. Insert the plug of power
source well after, the switch face plate of the protector of leakageof electricity must
ensure that is in ON ( beginning ) location.Fall if arising voltage drop, the protector
of leakage of electricity will automatic everything breaks , once after voltage normal,
should operate the protector of leakage of electricity again in REST cubes ( reset )
location. The protector of leakage of electricity specified movement current is 30mA.
Pay attention: Quote clean source of water surely , contain grit waiting for until
the water of impurity may damage the water set sealing ring of machine,biggest
hydraulic pressure is 3BAR.
Step 3: Source of water joins , the radom ware additional water inlet of flaxible
tube holds to have " fast joint" may join to wire reinforced suction hose very
conveniently on water supply system.
Pay attention: If the protector function of leakage of electricity is not normal ,
please do not want manipulator ware.
Step 4: Safety is tested , pressing generator switch and machine ( soft start
switch ) start smoothly. Press the protector button of leakage of electricity of " test ",
machine stops operation , then resumes the power supply for machine again
according to the button of " reset ".
Pay attention: Must cannot soak the protector of leakage of electricity in water.
Must often pass according to press TEST button, come to inspect its function whether
is normal. Suggesting operator not to operate do not take the diamond drilling
machine of the protector of leakage of electricity.

BEGIN TO OPERATE

1、Choose suitable diamond bit
The main shaft of our company deducts 4 kinds uses type frequently, please c-
hoose the reliable diamond bit of quality. Choose sharp tool , And ensure that dia-
mond knife is first to have enough backlash( the thickness of knife head the thick-
ness that is larger than tube wall , such do good to more in row bits) between met-
al tube wall. It is above that using waterproof oil paint in the bit to deduct, in order
to make dismantling bit convenient. Ensure bit way jump do not be larger than 1
mm( eccentricity).
2、Fix frame in face
Regular method has expansion bolts to fix ; vacuum sucker is fixed ; supports
regular etc..
The most general method is fixed for expansion bolt, please use the diameter
of metal expansion bolt and bolt as far as possible, must be larger than 12 mm.
Using vacuum sucker fix , ensure that vavuum pump has enough efficiency,sealing
ring complete have no breakage. Adopting support ensure when fixing way that
frame has enough stability.
3
4