AGRI-COVER ACI SRT-2 Manual de instrucciones de instalación - Página 2

Navegue en línea o descargue pdf Manual de instrucciones de instalación para Accesorios para tractores AGRI-COVER ACI SRT-2. AGRI-COVER ACI SRT-2 8 páginas.
También para AGRI-COVER ACI SRT-2: Manual de instrucciones de instalación (8 páginas)

PREPARATION
• Prior to tarp system assembly, park truck or trailer on level ground.
• Box must be square and straight, center must not be pulled together or spread apart.
• Remove or grind smooth any sharp edges or points contacting tarp and/or cables.
• Remove or reposition any interferences with motor. If modifications to box are
needed, consult box manufacturer.
• Ensure box extension is secure by bolting in place on top of your box.
TOOLS NEEDED
• (2) 1/2" Wrenches
• 9/16" Wrench
• Step ladders or scaffolding
• Drill with 5/16" and 3/8" bits
• Tape measure
• Hammer
• Protective eyewear
• Cutting tool
• Marking pencil
NOTE: Hardware appearance and components may vary.
CAUTION: Before drilling, ensure there are no hidden wires or gussets in line
!
with holes to be drilled.
CAUTION: To avoid galling of stainless steel hardware, use anti-galling
!
spray, grease or lubricant on threads and avoid high speed when fastening.
Do not use impact tools for stainless steel hardware.
3/8" x 1" non-stainless steel self-threading bolts: Use to cut threads into 5/16"
holes. Drill 5/16" hole. Turn 3/8" x 1" self-threading bolt in hole to cut threads, then
turn back out.
STAINLESS STEEL ONLY
2