AFF 202LCJ Manual del usuario - Página 4
Navegue en línea o descargue pdf Manual del usuario para Jacks AFF 202LCJ. AFF 202LCJ 13 páginas. 2-ton long chassis floor jack — super duty
3.2.3
Undo the screw (B) in the handle socket, until it no longer protrudes into the handle socket.
3.2.4
Insert the pump handle into the handle socket hole completely.
3.2.5
Ensure that the handle is completely inserted into the socket, then tighten the handle socket screw (B).
Please make sure that the handle can be turned smoothly
HYDRAULIC SYSTEM PURGING
4.1
Open the release valve by turning it two full turns counter-clockwise.
4.2
Pump the handle a minimum of four full strokes quickly.
4.3
Close the release valve by turning it clockwise.
4.4
Pumping the handle with full strokes to check if it can reach the maximum height by eight pumps.
If it can't reach the maximum height by eight pumps, please refer to the following special purging process:
4.5
Open the release valve by turning counter-clockwise and lower the lifting arm to the minimum height.
4.6
Put the jack on a flat working table, carefully lift and support the front part of the jack to make sure
the front part is at least 500 mm higher than the end part of the jack.
4.7
Pump the handle a minimum of four full strokes quickly.
4.8
Put the jack on a flat surface and close the release valve by turning it clockwise.
4.9
Pumping the handle with full strokes to check if it can reach the maximum height by eight pumps,
if not please repeat the special purging process again.
4
B
affjaxx.com