HHP PBNU-LD06P040 Manual de instrucciones de instalación - Página 8
Navegue en línea o descargue pdf Manual de instrucciones de instalación para Horno HHP PBNU-LD06P040. HHP PBNU-LD06P040 20 páginas. Gas-fired furnaces high-efficiency upflow condensing models
Once the pip' i ng size is deter mined, the combustion air intak e
collar must be connected to that size piping. Units rated from
40 MBH input
MBH output) to 80 MBH input (76 MBH
(38
output) are equipped with intake collars which accommodate
diameter piping. The 100 MBH input
2·
through 144 MBH in put (133 MBH output) units have collar s for
3·
diam eter piping. When the pipe size listed in the table is
different than the size of the intake collar provided with the unit,
transition should be made as illustrated in Figure 3.
UNITS WITH
80 MEJH INPUT (76 OUT)
FlGURE 3 -COMBUSTION AI R PIPING ADAP TATION
VENT PIPE CONNECTIONS
All models are provided with a combustion blower elbow which
accommodates 2" diameter vent pipe. This elbow may be
positioned for right or left exit from the unit as required for the
installation conditions.
With reference to the p1p1ng s1z1ng table, where units are
installed with a vent pipe of a different diameter than the
exhaust elbow, reduction or expansion fittings must be incor
porated by the installer at the time of installation. Examples of
such adaptation are shown in Figure 4.
UNITS WITH
80- 160 MBH INPVT
(76-152 OUTPUD
(E•cep! 100 lnput/ilS OvtpvQ 3·X2· dia.
REDUCING
BUSH IN
T PIPING ADAPTATION
VEN
FlGURE 4-
PIPING ASSEMBLY
The final assembly procedure for the vent/combustion air pip
ing is as follows:
1. Cut piping to the · p roper length, beginning at the furnace.
2. Deburr the piping inside and outside.
3. Chamfer the outer edges of th€ piping.
4. Dry-fit the entire vent/combustion air piping assembly.
n
5. Disassemble the pipi
cement per the cement manuf?-cturer's instructions.
·
Unitary Products Group
MBH ou tput)
(95
U'IITS WITH
100 MSH INPUT {95 Oun
g
and apply cement primer and
Primer and cement must conform to ASTM
PVC, or AS TM
02235
WARNING: Solvent cements are flammable and mus t be usee.
in wel!-ventilq,ted areas only. Keep them away from hear
sparks and opea flames (including pilots}. Do not breatht
vapors and avoid contact with skin and eyes.
6. All joints must be made to provide a permanent, air-tight
water-tight seal. The only exception to this means o
joining is where the street elbow is joined to the vente
assembly. This joint should be ma· d e with RTV sealant. 1
slainless steel screw should be used in the hole in th,
venter housing to keep the street elbo· w in proper align
ment. If the street elbow is changed for a left side exit, th
stainless steel screw mu.st be reused in the new locatior
If the elbow/drain is used for right side exit. carefull
remove the plastic cap which is factory installed on th
lower left drain connection (see Figure
tubing and clamp from the lower right drain connection t
the lower left drain connection. Place the plastic cap ont
the lower right drain connection.
NOT£: The upper drain connections are not used in upflo
installations and are internally sealed.
FACTORY
CAPPED
SIDE
FIGURE 5- DRAIN CAP LOCATION
Drain tubing from the drain fitting must be routed to prevE
kinks and low spots. This tubing may have to be cut a
shortened when the flue piping is routed out of the left side
the furnace.
7. Support the combustion air and vent piping such that it
angled 1/4" per linear foot upward from the furnace. Pi pi
should be supported with pipe hangers to prevent saggir
Maximum spacing betWeen hangers is five
SDR-PVC piping, where maximum spacing is three
feet.
8. The vent piping must be installed so as to prevent acr
mulation of condensate and where necessary, ha
means provided for drainage of condensate.
Seal around the openings where the combustion air
9.
vent piping pass through the roof of side wall.
CAUTION: Vent piping must be insulated with 112' Armat
insulation if it will be subjected to freezing temperatu
such as routing through unheated areas or through
unused chimney.
The combustion air piping must be insulated with
Armaflex insulation if it is installed above a suspe nded ceil
·
or in a warm, humid space such as a laundry room to prev
possible condensation from forming on the outside of the pi
o::;o.65-l'-;2
02564
for ABS piping.
5).
Move the drai
(5)
feet, excf
1/2"
fo:
a
tr