5th Wheel 5LCHM02 Manual del usuario - Página 8

Navegue en línea o descargue pdf Manual del usuario para Scooter 5th Wheel 5LCHM02. 5th Wheel 5LCHM02 18 páginas.

5th Wheel 5LCHM02 Manual del usuario

4 Assembly Guide

1.Unfold the scooter and put the kickstand down.
Pull the lock catch upwards.
Pull the folding handle downwards.
(Refer
toUnfolding
Operations)
3.Connect the main line and attach the handlebar
to the stem.
Strictly follow the arrow
marks to align the slots
and install the handlebar,
and make sure that the
spring is put back to its
original position after the
wiring is completed.
12
2.Pull the spring to bring out the lower main line
connector.
a. Pull out the spring from the
stem before installation;
b. Pull the spring up to 7-10cm
to bring out the lower main line
connector;
c. Do not touch the main line
interface during the pulling
process.
4.Tighten the screws with the tools included in
the package and press the power button to
check if it works normally.
Use the tool included in
the package
to tighten the screws.
Check the power button
after the completion of
assembly.

5 Unfolding/Folding/Carrying

1.Push up the shackle.
3.Lift the head of the scooter.
2.Pull the folding handle downwards and outwards.
4.Close the folding handle upwards.
13