Great Lakes SR Series Manual de instrucciones de instalación - Página 7

Navegue en línea o descargue pdf Manual de instrucciones de instalación para Bastidores y soportes Great Lakes SR Series. Great Lakes SR Series 8 páginas. 19" eia wall mount swing rack
También para Great Lakes SR Series: Manual de instrucciones de instalación (12 páginas)

Great Lakes SR Series Manual de instrucciones de instalación
UNIVERSAL
The 19" EIA Swing Frame Rack can be hinged (retractable pin) on either side.
Customer needs to determine which side is to open. To open, simply retract
both pins (top and bottom) and then open the Swing Frame Rack similar to that
of a door.
LEFT HAND
OR
RIGHT HAND
CAUTION:
When installing 19" EIA equipment, make sure both retractable pins (2) are
secured into the rear section that has been mounted to the wall. Be sure
all screws, nuts, and mounting hardware are tightened before loading with
equipment.
Secure retractable pins into receptacle (2 locations)
7