75F Pressure Controller Instrucciones de instalación y funcionamiento - Página 5

Navegue en línea o descargue pdf Instrucciones de instalación y funcionamiento para Accesorios 75F Pressure Controller. 75F Pressure Controller 7 páginas. Pressure sensor package

low pressure port and run the other end to the exterior pickup port.
Cut to length and push the tubing to the barbed connector on the
pickup port. Using the leftover length of tubing, connect to the high-
pressure port on the A/DP2 and run the length to the interior pickup
port.
|
PAIRING
Pair the Pressure controller
Once power is supplied to the system, the Smart Node should read
default room.
1. Press the Right button on the Smart Node until "Advertising"
is displayed.
2.
Fig. 5
2. With the CCU Tablet within 20' of the Smart Node press "Pair
Pressure Sensor" from Setup > Settings > System Devices >
Pressure.
3. When the Bluetooth pairing process is complete on the Tablet the
Pressure Smart Node will read only "Pressure" until the CM and
Tablet are reconnected. Now pair other modules or snap the Tablet
back onto
communicating over the 900Mhz channel. Once communicating over
long range the Pressure Smart Node will display relevant information.
the
CM.
The
as a Pressure sensor in System Devices.
Pressure
Smart Node will
www.75f.io
begin
888.590.8995 x2