AFFIX MADW 1020-AGR Manual de montaje - Página 12
Navegue en línea o descargue pdf Manual de montaje para Escritorio AFFIX MADW 1020-AGR. AFFIX MADW 1020-AGR 20 páginas. Aluminium double width mobile towers
ASSEMBLY
Step 11
Step 11.1
Step 11.1
Hook the Working Trapdoor platform on
the 2nd Rung of the 3rd level frames.
Make sure the trapdoor is towards the
ladder side.
Step 11.2
Step 11.2
Also hook the Fixed platform beside the
Trapdoor platform on the same rungs
Step 12
Step 12.1
Step 12.1
Clamp the 4 plastic toe-board holders on
all the 4 corners of the working platform
level, around the working platform.
For more details, refer to Toe-board
Assembly Details on Page 12
Step 12.2
Step 12.2
Insert the wooden toe-boards in the
toe-board holder on all the 4 sides.
11