Gree 13-04595 Manual del usuario - Página 7

Navegue en línea o descargue pdf Manual del usuario para Aire acondicionado Gree 13-04595. Gree 13-04595 18 páginas. Window air conditioner

Gree 13-04595 Manual del usuario

Position the Air Conditioner

Handle air conditioner with care.
Be sure your air conditioner does not fall out of the
opening during installation or removal.
The place where the power cord exits the air condi-
tioner should be no more than 4 ft (122 cm) from a
grounded outlet.
Do not block the louvers in the front panel.
2-STORM WINDOW REQUIREMENTS
A storm window frame will not allow the air conditioner to tilt toward the outside, and will keep it
from draining properly.
To adjust for this, attach a piece of wood to the sill.
WOOD PIECES
WIDTH : 2"
LENGTH : Long enough to fit inside the window frame.
THICKNESS : To determine the thickness, place
a piece of wood on the sill to make it 1/2"
higher than the top of the storm window
frame or the vinyl frame.
Attach securely with nails or screws provided
by the installer.
3-ATTACH THE TOP MOUNTING RAIL SEAL STRIP
(Some models may have the seal strip already attached to the top mounting rail.
If applicable, skip this step.)
Remove the backing from the top mounting rail seal strip and attach the seal
strip to the bottom of the top mounting rail, along the front edge.
Top mounting rail
4-PREPARE THE AIR CONDITIONER
A. Install the top mounting rail with 4 Type A
screws from the outside of the case.
B. Hold the accordion panel in one hand and
gently pull back to free the open end.
Use two or more people to move and
install air conditioner.
Failure to do so can result in back or
other injury.
1/2" higher
than storm
window
frame
Storm window
frame
FRONT VIEW
Remove backing
from seal strip
Top mounting rail
Bottom mounting rail
7
WARNING
Excessive Weight Hazard
1/2" higher
than vinyl frame
(on some windows)
Sill
Vinyl frame
Top mounting rail
Seal strip
Wood