AutomationDirect CLICK C0-08SIM Manual - Página 2

Navegue en línea o descargue pdf Manual para Unidad de control AutomationDirect CLICK C0-08SIM. AutomationDirect CLICK C0-08SIM 3 páginas. Expansion i/o module

AutomationDirect CLICK C0-08SIM Manual
C0-08SIM CLICK Expansion I/O Module
Installation and Mounting
1. Safety Installation, Wiring or Handling
• Discharge static electricity before installation or wiring, in order to avoid electric
equipment damage.
2. Preface
• CLICK C0-08SIM is supported by CLICK Programming software Ver 2.60
or higher.
Installing Expansion I/O Modules:
1. Remove protective cover over buss port.
2. Push the LOCK slide (top and bottom of modules) to "UNLOCK".
3. Align module pins and tabs (attachment of modules) into adjacent slots and
firmly push together.
4. Push the LOCK slides to "LOCK" to lock modules rigidly together.
Modules easily connect to each other.
3
2
1
OPEN
To remove an I/O module, first disconnect all phases of external
power source and wait
5 seconds
expansion I/O module of a functioning system.
Then push LOCK slides to "UNLOCK" and gently separate modules.
Copyright© 2020, Automationdirect.com Incorporated/All Rights Reserved Worldwide
www.automationdirect.com/click-plc
Locking Tabs (Top and Bottom)
CLOSED
before installing or removing the
Additional Help and Support
• For additional technical support and questions, call our
Technical Support team @ 1-800-633-0405 or 770-844-4200
Safety Installation
Please heed the following instructions when
installing:
• Mount the CLICK PLC unit horizontally to provide
proper ventilation.
• Do not mount the CLICK PLC unit upside down, on
a horizontal surface, or in a vertical arrangement.
• There is a minimum clearance requirement of
2in. (51mm) from all sides of the cabinet and the
equipment.
• There is a minimum clearance requirement of 3in.
(76mm) from the wiring ducts and the equipment.
• Please use this product in a metal enclosure/cabinet.
Air
Flow
Enclosures
It is important to select the appropriate enclosure to ensure safe and proper
operation of your CLICK PLC system. Control applications vary, and yours may
require additional considerations. At a minimum your enclosure should include
the following:
• Conformance to electrical standards
• Protection from the elements in an industrial environment
• Common ground reference
• Maintenance of specified ambient temperature
• Access to equipment
• Security or restricted access
• Sufficient space for proper installation and maintenance of equipment
• When installing modules and CPU on DIN rails, always
use end brackets on both ends of assembly.
• You should use 35mm width DIN Rails.
• You should use M4 size screws when you surface mount.
• You should tighten the screws with a spring washer and
a small round washer and torque (0.5 to 0.6 N·m).
Do not operate without first installing safety cover
over power supply leads.
CLK-2
CLICK Module Insert
3505 HUTCHINSON ROAD
CUMMING, GA 30040-5860
Minimum clearance requirement
51mm
of 51mm for A, B, and C.
CAUTION
CAUTION
1-800-633-0405