Automationdirect.com Productivity 2000 P2-16AD-2 Manual - Página 5

Navegue en línea o descargue pdf Manual para Sistemas de E/S Automationdirect.com Productivity 2000 P2-16AD-2. Automationdirect.com Productivity 2000 P2-16AD-2 8 páginas. Analog input

Automationdirect.com Productivity 2000 P2-16AD-2 Manual

Wiring Options

1
ZIPLink Feed Through Modules and Cables¹
ZL-RTB20-1
ZL-RTB20
2
Terminal Block with pigtail cable
3
Accessories²
1. Cable + ZIPLink Module = Complete System
2. ZL-RTB-COM provides a common connection point for power or ground
Sales 800-633-0405
ZIPLink pre-wired
terminal block cables
0.5m (1.6FT) cable
ZL-P2-CBL24
1.0m (3.3FT) cable
ZL-P2-CBL24-1
2.0m (6.6FT) cable
ZL-P2-CBL24-2
ZL-RTB20
ZIPLink Modules
ZL-RTB20-1
1.0m (3.3FT) cable
ZL-P2-CBL24-1P
2.0m (6.6FT) cable
ZL-P2-CBL24-2P
ZL-RTB-COM
TW-SD-SL-1
TW-SD-MSL-1

Module Configuration

Using the Hardware Configuration tool in the
Productivity Suite programming software, drag
and drop the P2-16AD-2 module into the base
configuration.
Select Automatic Module Verification or No
Verification and Enable Hot Swap. If desired,
assign a User Tagname to each input point
(channel) selected and to each Status Bit Item.
www.productivity2000.com
5