ActivePure Induct Guardian I Manual - Página 6
Navegue en línea o descargue pdf Manual para Unidad de control ActivePure Induct Guardian I. ActivePure Induct Guardian I 16 páginas.
FIBERGLASS DUCTWORK INSTALLATION
Power Connection Requirements: This device is designed to operate using
a 24 VAC, 40Va transformer. Transformers supplied with a straight cooling
or HVAC system may be used to power the device but must be verified it's
capable of handling the additional device load before installation. If the system
transformer is not capable of handing the extra load, a separate 24 VAC, 40Va
WARNING
transformer MUST be used. Do not connect the device to any power source
with a voltage less than 22 VAC and a maximum of 32 VAC. Doing so will cause
damage to the device.
1. Locate suitable area of
duct for installation.
3. Cut hole in duct using 3.5" hole saw.
ALTERNATE CUTTING METHOD
a. Using the mounting plate, mark 4
holes for alternative cutting method
on duct. If, not already done, mark 4
corner holes.
c. Cut between holes using a utility knife. Continue with #4 (above).
6
2. Mark location for 3.5" opening using
the mounting plate. Also mark the
locations of 4 screw holes in corners.
4. Drill 4 holes (at corner screw
locations) using a 3/8" drill bit.
b. Draw a line between each
alternative cutting method marks
(as shown).