Hidrotermal Hidro-SS Series Manual del usuario - Página 6

Navegue en línea o descargue pdf Manual del usuario para Hierro Hidrotermal Hidro-SS Series. Hidrotermal Hidro-SS Series 15 páginas.

Hidrotermal Hidro-SS Series Manual del usuario
2. Install the pipe ( See Figure 2):
All plumbing shall be installed by a qualified plumber.
A. Connect the water inlet via ball valve by 1/2" metal hose pipe for water supply.
B. Connect the steam line with 1/2"copper tube for steam release. (CANNOT use the metal or
zincification pipe to replace the copper tube).
C. After working one hour, the generator will stop and drain automatic to wash the steamer tank,
so the drain pipe should be connected a 1/2" water pine for discharge.
D. The connection of steam tube need to be coated by silicone caulk to prevent the leakage.
Figure 2: Pipe Installation
Warning:
A. If the generator is mounted in a place where is difficult to access, the water supply shut-off
valve should be located where it can be quickly accessed in emergency.
B. The max pressure of magnetic valve is 2Pa, the higher pressure will damage the valve. Need
to install a decompress valve or turn down the water inlet valve to prevent the damage.
C. Do not use a saddle valve or saddle fitting for the water inlet valve, flush water supply line
before final connection.
D. CANNOT install a valve in steam line.
E. Generator can not be installed outside, or the place easy to ice up.
F. If water supply pipe have sediment, it should install one filter on metal hose.