CELETTE CEL.11244-G-01 Manual original - Página 14

Navegue en línea o descargue pdf Manual original para Sistema de soldadura CELETTE CEL.11244-G-01. CELETTE CEL.11244-G-01 20 páginas.

CELETTE CEL.11244-G-01 Manual original

3.9 OPERATING PROCESS FOR STUD WELDING:

Note: Protect your eyes and your body when stud welding. Please operate the machine as follow.

3.9.1 PREPARATION FOR OPERATION:

1. Keep the work piece free of dirt ,oil, paint and rust.
2. If the base metal is thin, it will dent at pressure .It must add a base plate, when stud welding.
3. Select suitable stud welding torch, according as material, diameter, length of the stud screw.
4. Make sure the diameter of the clamp is correct and the length of the gag lever post is correct.
Install the screw clamp and gag lever post in the torch.
5. Make sure all the cables connect to the machine and workpiece. Connect input cable and turn on.

3.9.2 OPERATE STUD WELDING:

1. Insert the stud screw to screw clamp.
Note: Make sure the stud screw insert to the end of the screw clamp and contact the gag lever post.
2. Keep the 3 support feet contact the base metal. The torch presses on base metal vertically. (Diagram 25)
Note: Keep H-10torch contact the base metal, after insert the stud screw.
3. Press torch trigger. Discharge -> Stud welding complete.
4. After stud welding complete, release the trigger, move back the torch vertically. (DIagram 26)
Install the screw clamp and gag lever post in the torch.
Please test stud welding and setting suitable the welding strength before formal production.
DIAGRAM 24
SCREW CLAMP
STUD SCREW

3.10 MAINTENANCE:

1. The machine and torch must to keep away from dust, humidity, rain.
2. Avoid vibration, when move the machine.
3. Do not put the machine reversely, protect the machine.
4. Clean the dust and check the screw, which can keep the machine in good condition.
5. Turn off the switch, when not use the machine.

3.11 SELECT STUD SCREW:

Metal: Soft steel, stainless steel, aluminium, titanium (Ti), brass, copper.
1. Model
F
TOTAL
LENGTH
www.celette.com
DIAGRAM 25
STUD SCREW
SCREW
3 SUPPORT FEET
S
TOTAL
LENGTH
DIAGRAM 26
TP
THREAD
DIAMETER
TOTAL
LENGTH
SCREW
DIAMETER
Page No: 14